Our Projects

To see each project GPS point in google maps, click on the respective image. The coordenates point in the map, represents influence area, not necessarily the exact place where project is located.
la-cruz-solar

La Cruz Solar, 2020

Photovoltaic park with a power of 58MW, located 9.8 km north of the Municipality of María Elena, Province of Tocopilla, Antofagasta Region, north of Route 24 and on the west side of Route 5 North. The energy generated will be injected into the SING (Sistema Interconectado del Norte Grande). Geodrill Ltda. Performed the driving piles services.

tamaya

TAMAYA, 2020

Photovoltaic Solar Park built by Engie Energía Chile, will have a nominal power of 122.4MW, is located in the commune of Tocopillas, Second Region of Antefoagasta. It will be connected to the current and existing Tamaya Electric Substation that is located into the Barriles Power Plant. Geodrill Ltda. Performed the driving piles services.

san-ramiro

San Ramiro, 2020

Solar photovoltaic plant built by the Uruguayan multinational VENTUS, will have a nominal power of 9MW, it is located in the Commune of San Pedro, Melipilla Province, Metropolitan Region. The energy generated will be injected into the S.I.C. (Central Interconnected System). Geodrill Ltda. Performed the driving piles services.

sol-del-desierto

Sol del Desierto, 2020

The photovoltaic project developed by Atlas Renewable Energy, will have a power of 230MW, and located 60kms from Calama, Second Region of Antofagasta. The energy generated will be injected into the S.I.N.G. (Sistema Interconectado del Norte Grande). Geodrill Ltda. Performed the driving piles services.

campos-de-sol

Campos de Sol, 2020

Photovoltaic Solar Park built by ENEL Green Power, will have a nominal power of 380MW, it is located near the Carrera Pinto substation, between Copiapó and Diego de Almagro. The generated energy will be injected into the SEN (National Electric System). Geodrill Ltda. Performed the services of driving piles.

malgarida-ii

Malgarida II, 2020

Photovoltaic Solar Park built by Acciona, will have a nominal power of 162.68MW, it is located in the commune of Diego de Almagro, Chañaral Province, in the Third Region, Atacama Region. The energy generated will be injected into the SIC (Central Interconnected System). Geodrill Ltda. Performed the services of driving piles.

rio-escondido

Río Escondido, 2020

Photovoltaic Solar Park built by Mainstream Renewable Power, will have a capacity of 145MW, is located in Tierra Amarilla, 58km from the city of Copiapó, in the Atacama Region. The energy generated will be injected into the SEN (National Electric System). Geodrill Ltda. Performed the services of driving piles.

san-pedro-iv

San Pedro IV, 2020

Photovoltaic Solar Park built by PRODIEL, with a power of + 100MW, is located in the Antofagasta Region and very close to the city of Calama, Second Region. The energy generated will be injected into the Norte Grande Interconnected System (S.I.N.G.) Geodrill Ltda. Performed the services of driving profiles.

san-pedro-i

San Pedro I, 2020

Photovoltaic Solar Park built by PRODIEL, with a power of + 100MW, is located in the Antofagasta Region and very close to the city of Calama, Second Region. The energy generated will be injected into the Norte Grande Interconnected System (S.I.N.G.) Geodrill Ltda. Performed the services of driving profiles.

covadonga

Covadonga, 2020

Solar plant built by D´E Capital, with a power of 10MW, is located in the city of Atacama, Third Region. The energy generated will be injected into EMELAT Distribution, it is a distributed generation project, and will contribute to the growing supply of electricity demand. Geodrill Ltda. Performed the services of driving piles.

capricornio

Capricornio, 2020

This photovoltaic plant built by ENGIE, with a power of 20MW, is located in the city of Antofagasta, Second Region. The energy generated will be injected into the Norte Grande Interconnected System, at the S/E Capricorn interconnection point. Geodrill Ltda. Performed the services of driving piles.

andes-solar-ii

Andes Solar II, 2019

Expansion of the Andes Solar II photovoltaic solar farm with a nominal power of 80MW, built by Prodiel, will inject its production into the Norte Grande Interconnected System (S.I.N.G), through the Andes Sub Station. It is located 260km south east of the city of Antofagasta. Geodrill Ltda. Performed driving piles services.

lambert

Lambert, 2019

This PFV built by ByL Ingeniería, with a power of 3MW, is located in the city of Lambert, Fourth Region, La Serena. The energy generated will be injected into the Central Interconnected System (S.I.C.), at the point of interconnection of the Marquesa electrical substation.
Geodrill Ltda. Performed the driving piles services.

atacama-solar-2

Atacama Solar II, 2019

This photovoltaic plant built by Sonnedix SpA, with a power of 180MW, is located in the city of Pica, Tarapacá Region. The energy generated will be injected into the Central Interconnected System (S.I.C.), at the point of interconnection in the Lagunas electrical substation.
Geodrill Ltda. performed the services of driving piles.

sol-del-norte

Sol del Norte, 2019

This photovoltaic plant built by Thesan SpA, with a power of 9MW, is located in the city of Peine, San Pedro de Atacama, Antofagasta Region. The energy generated will be injected into the Central Interconnected System (S.I.C.), at the point of interconnection in the Andes electrical substation. Geodrill Ltda. Performed the services of driving piles.

andes

Andes, 2019

This photovoltaic plant built by Thesan SpA, with a power of 9MW, is located in the city of Peine, San Pedro de Atacama, Antofagasta Region. The energy generated will be injected into the Central Interconnected System (S.I.C.), at the point of interconnection in the Andes electrical substation. Geodrill Ltda. Performed the services of driving piles.

desierto

Desierto, 2019

This photovoltaic plant built by Thesan SpA, with a power of 9MW, is located in the city of Peine, San Pedro de Atacama, Antofagasta Region. The energy generated will be injected into the Central Interconnected System (S.I.C.), at the point of interconnection in the Andes electrical substation. Geodrill Ltda. Performed the services of driving piles.

rauquen

Rauquén, 2019

Photovoltaic Solar Plant built by Grenergy, with a power of 9MW, in the commune of Romeral, province of Curicó, Maule Region, specifically in the rural sector of Quilvo Alto. The generated energy will be injected into the Central Interconnected System (S.I.C.) through an evacuation line of 13.2 kV. Geodrill Ltda. Performed the services of driving piles.

lemu

Lemu, 2019

This photovoltaic plant built by Grenergy, with a power of 5MW, in the comunne of San Javier, province of Linares, Maule Region. The energy generated will be evacuated to the existing distribution network, Central Interconnected System (S.I.C.) through an evacuation line of 23 kV.
Geodrill Ltda. Performed the services of driving piles.

las-chacras

Las Chacras, 2019

This photovoltaic plant built by Flux Solar, with a power of 3MW, in the Province of Cachapoal, Region of the General Liberator Bernardo O'Higgins. The generated energy will be injected into the Central Interconnected System (S.I.C.), at the 13.2kV Las Chacras feeder, S/E La Esperanza.
Geodrill Ltda. performed the services of driving piles.

don-mariano

Don Mariano, 2019

Photovoltaic Solar Plant built by Flux Solar, with a power of 3MW, located in the commune of Pelequén, Province of Cachapoal, Region of the General Liberator Bernardo O'Higgins. The generated energy will be injected into the Central Interconnected System (S.I.C.), at the Santa Rosa 15 kV, S/E Pelequén feeder.
Geodrill Ltda. Performed the services of driving piles.

acacia

Acacia, 2019

This photovoltaic plant built by Flux Solar, with a power of 3MW, in the Province of Cachapoal, Region of the General Liberator Bernardo O'Higgins. The generated energy will be injected into the Central Interconnected System (S.I.C.), at the 13.2kV Las Chacras feeder interconnection point, S/E La Esperanza.
Geodrill Ltda. performed the services of driving piles.

viñamar

Viñamar, 2019

Two photovoltaics plants of 123kw each one, produces electricity for the internal consumption system, Viña San Pedro de Tarapacá, located in Casablanca, V Region of Valparaíso. This plants are On-grid systems, off-network, turnkey system that provides Viñamar was designed and built by EVOLUSUN. Geodrill Ltda. performed the service of screwing of 320 galvanized bolts for fixed structures.

rovian

C.D. CCU Copiapó, 2019

Plan to reinforce fluvial containment walls and floods.
This Distribution Center is located 813 Kms from Santiago by PanAmerican North 5, city of Copiapó, Atacama Region. Were installed 150 HEA type piles with a depth of 1.5M.

Geodrill Ltda. performed the services of driving piles.

rovian

Rovian, 2019

This photovoltaic plant built by Grenergy, with a nominal power of 8MW, located in the Commune of Nancagua, Province of Cachapoal, Region of Libertador General Bernardo O'Higgins. The generated energy will be injected into the Central Interconnected System (S.I.C.)
Geodrill Ltda. Performed the driving piles services.

donihue

Doñihue, 2019

This photovoltaic solar park built by Grenergy, with a power of 7.5MW, located in the Commune of Coinco, Province of Cachapoal, Region of Libertador General Bernardo O'Higgins. The access will be made by the route H-38. The energy generated will be injected into the existing distribution network through a 15 kV evacuation line.

las-codornices

Las Codornices, 2019

Photovoltaic project built by oEnergy, with a power of 3MW, located in a 10 acres, located on Plot No. 17 of San Miguel de Ablemo, 3 kilometers south of San Carlos, Province of Ñuble, Biobío Region.
The energy generated in the PFV Las Codornices will be injected through the San Carlos feeder in the San Carlos substation.

el-pedregal

Santa Rosa, 2019

Photovoltaic project built by Grenergy, with a 9MW power, located in San Pedro, Metropolitan Region. The energy generated in the PFV Santa Rosa will be evacuated through a medium voltage line (LMT) of 23kV, to the El Membrillo feeder, and will inject its production into the Central Interconnected System (SIC) through an existing Subtransmission Line.

lomas-de-pangal

Lomas de Pangal, 2018

Viña Lomas de Pangal, located in Pelarco, VII Region, PFV supplies electricity for the irrigation system of the Vineyard. It includes a mounting system manufacturer T-WERK, for 60 Heckert-Solar photovoltaic modules, with a total power of 16.2 kWp. It incorporates the use of active monitoring using data collector SOLAR-LOG 1200 wifi.

semillas-gramineas

Semillas Gramíneas, 2018

Semillas Gramíneas Ltda., located in San Clemente, VII Region. PFV supplies electric power to a deep well pump for water irrigation. It includes a mounting system manufactured by T-WERK, for 120 Solar-Fabrik photovoltaic modules, with a total power of 32.4 kWp. It incorporates active monitoring with data collector SOLAR-LOG 1200 wifi.

el-pedregal

El Pedregal, 2018

The photovoltaic plant produces 100kw of electricity for water irrigation system onto El Pedregal farm, located in Río Mostazal, Monte Patria district, Fourth Region of Coquimbo.

This system is out of the electrical network, which provides the farm with up to 100% of its electricity was designed by Eco Ingeniería.

don-diego

Don Diego, 2018

The photovoltaic plant produces 53kv of electricity for the irrigation system in this farm, located in Cuncumén Park, Metropolitan Region.

This system is out of the electrical network, which provides the farm with up to 100% of its electricity was designed and built by Kraftwerk Renewable Power Solutions GmbH in Germany.

alto-solar

Alto Solar, 2018

Scotta develops a photovoltaic solar plant of 3MW, with immovable structures. Located in San Pedro, Melipilla, La Manga sector, Metropolitan Region. The electrical production of this solar photovoltaic plant will be injected into the Central Interconnected System (S.I.C.).
Geodrill Ltda. performed the driving piles services.

el-quehule

El Queule, 2018

Scotta develops a PFV of 9MW, with Convert followers structures, located in El Tabón, in the town of El Carmen (Las Cabras Commune, VI Region of O'Higgins), its production will be injected to the S.I.C., and the interconnection point into El Estero, SE El Manzano.
Geodrill Ltda. Performed the driving piles services.

el-chincol

El Chincol, 2018

SYBAC Solar Systems Chile, is developing a 3.5MW solar photovoltaic park, near to Ñiquen, VIII Region of Biobío.
The produced energy will be injected into the Central Interconnected System (S.I.C.), Interconnection point Ñiquén substation.

In this project, both the process of pull out and driving piles services were did by Geodrill Ltda.

el-picureo

El Picureo, 2018

SYBAC Solar Systems Chile, develops a 3.5MW solar photovoltaic park, located in Quinta Morsa, VI Region of Libertador General Bernardo O'Higgins, its production will be injected into the Central Interconnected System, point of interconnection Quinta substation. Geodrill Ltda. Made pull out of piles services and driving piles services.

mostazal

Mostazal, 2018

Solar park with 33,600 solar panels of 320Wp each and a 15kV transmission line. The production will be injected into the Central Interconnected System (SIC). The estimated production is 19.4GWh/y.
The construction would have a deadline of up to six months. Geodrill Ltda. Made pull out of piles services and driving piles services.

las-nueces

Las Nueces, 2018

The photovoltaic plant produces 32kv of electricity for the irrigation system in the Las Nueces farm, located in Pelarco, Maule Region.This system is out of the electrical network, which provides the farm with up to 100% of its electricity was designed and built by Kraftwerk Renewable Power Solutions GmbH in Germany.

los-gorriones

Los Gorriones, 2018

SYBAC Solar Systems Chile, develops a photovoltaic solar park of 3MW, located in Ninhue.
The production will be injected to the Central Interconnected System at the point of interconnection to the Copihue Feeder, S / E Retiro, VII Region, Maule Region. Geodrill Ltda. made the service of pull out of piles driving.

los-patos

Los Patos, 2018

oEnergy SpA, develops a 3MW photovoltaic solar farm, located in Talca, VII Region, Region of Maule.
The production generated by this solar park will be injected into the Central Interconnected System (S.I.C.).
In this project, both the process of pull out and driving piles services were did by Geodrill Ltda.

las-palomas

Las Palomas, 2018

oEnergy SpA, develops a photovoltaic solar park of 3MW, located north of Tres Esquinas, south-east of the city of Bulnes, by the N-69 route.
The production will be injected into the Central Interconnected System (S.I.C.).

In this project, both the process of pull out and driving piles services were did by Geodrill Ltda.

los-pitios

El Pitío, 2018

oEnergy, develops a photovoltaic solar park of 3MW, located in Longaví, VII Region, Maule Region. The production will be injected to the Central Interconnected System at the interconnection point to the Longaví 66kV S / E Power Supply. In this project, both the process of pull out and driving piles services were did by Geodrill Ltda.

don-francisco

Don Francisco, 2017

Grenergy develops a photovoltaic solar park of 3MW, its production will be injected into the Central Interconnection System to the Feeder in San Francisco de Mostazal, located in the sixth Region of the General Liberator Bernardo O'Higgins.
In this project, both the process of pull out and driving piles services were did by Geodrill Ltda.

san-pedro

Tierra Atacama Hotel & SPA, 2017

A photovoltaic plant of 23kw produces electricity for Tierra Atacama Hotel & Spa, located in San Pedro de Atacama. This systems is out of the electrical network, and turnkey, which provides the hotel with up to 50% of its electricity, was designed and built by Kraftwerk Renewable Power Solutions GmbH with headquarters in Weingarten, Germany.

don-eugenio

Don Eugenio, 2017

Grenergy develops a photovoltaic solar park of 3MW, which will be injected through the interconnection of the substation El Manzano.
Project located in the sixth region, del Liberator Bernardo O'Higgins.
In this project, both the process of pull out and driving piles services were did by Geodrill Ltda.

 

El-Roble

El Roble, 2017

CGE Distribución S.A. contemplate the construction of a solar park, which will be connected to the El Peumo substation, which will inject 3MW into the Central Interconnected System (SIC). Located in the commune of San Pedro, province of Melipilla, Metropolitan Region of Santiago. Geodrill Ltda. realized the driving piles service.

el-pilpen

El Pilpen, 2017

SYBAC Solar Systems Chile, develops a photovoltaic solar park of 3.5MW, its production will be injected to S.I.C. at the point of interconnection to the Chorombo Feeder 13.8kV in Melipilla, Metropolitan Region of Santiago.

In this project, both the process of pull out and driving piles services were did by Geodrill Ltda.

el-queltehue

El Queltehue, 2017

SYBAC Solar Systems Chile, develops a photovoltaic solar park of 3.5MW, its production will be injected to S.I.C. at the point of interconnection S / E Bollenar with 13.8kV in Melipilla, Metropolitan Region of Santiago.

Geodrill Ltda. Performed the service of Pull Out of piles and driving piles.

las-turcas

Las Turcas, 2017

SYBAC Solar Systems Chile, develops a photovoltaic solar park of 3.5MW, its production will be injected to S.I.C. at the interconnection point Tantehue feeder in Melipilla, Metropolitan Region of Santiago.

Geodrill Ltda. Performed the service in tests of Pull Out of piles and service of driving piles.

Cerro-Pabellon

Cerro Pabellón, 2017

Enel Green Power, develops a photovoltaics solar park of 48MW in Cerro Pabellón Geothermal Project, located in Ollagüe district, Antofagasta Region. Geodrill Ltda. carried out the service in Pull Out of piles tests and the service of driving piles, arranging all its machines, as a complement to the project in general.

El Pelicano

El Pelícano, 2016 - 2017

This photovoltaic park was built to generate 96 MW to supply power to Line 6 Santiago´s Subway Chile. This project is located in the commune of La Higuera, III Region, on the way to the La Silla observatory.

For the execution of this project Geodrill Ltda. used 6 machines and driven 35.000 piles approximately.

img

Genpac Solar II, 2016

This photovoltaic solar park project have 7MW, project based on solar panels, which is located in the area of Cardones, outside of Copiapó city. Geodrill Ltda. installed 7,500 screws galvanized piles for the solar structures, having one month and a half to ends the work.
Geodrill Ltda. performed pull out and driving piles services.

img

Carrera Pinto, 2016

Second stage of this Solar Park with a total capacity of 135MW instaled, includes the construction of a substation which connects and injects the power generated to Carrera Pinto substation, lends production to Central Interconnected System (S.I.C.). Located 17.5 kms northeast of Copiapo, city of Atacama. Geodrill Ltda. performed driving piles services.

img

Santa Julia, 2016

Geodrill Ltda. Performed the service in tests of Pull Out of piles and driving piles services in Santa Julia Photovoltaic Solar Park, with 3MW power, localizated in Petorca, V Region of Valparaiso, powered by iEnergía. Rain in land was a difficult in this job, but with the help of Pauselli 700 and drilling machines, has been demostrated was be the best solution.

img

Genpac Solar I, 2016

This photovoltaic solar park project have 6.7MW, which is located in the area of Cardones, outside of Copiapó city and the production will be injected into the SING.
Geodrill Ltda. performed the service of Pull Out of piles and is installing 7,000 screws piles for the solar structures, having three machines working in this project.

img

Quilapilún, 2015

The largest Photovoltaic Solar Park in Metropolitan Region, 110MW nominal power, located in Metropolitan Region (Colina District), owned by American SunEdison and is equipped with NEXTracker devices. This PSP will inject their production into S.I.C.

Geodrill Ltda. performed pull out and driving piles services.

img

San Pedro VI, 2015

This Solar Park has 22MW nominal power, is an expansion of photovoltaic plant of San Pedro de Atacama III, located in district El Loa, south east of the town of Calama and whose goal is the electric energy generation through the link to Norte Grande Interconnected System. Geodrill Ltda. performed pull out and driving piles services.

img

Almeida Solar, 2015

Almeida Solar Park pre drilling has been realized by Geodrill after that screw in the Almeida Solar Park in Diego de Almagro, Copiapo. The engineerig company, Prodiel, had to replace many broken photovoltaic structures by Salado river during the floods of 2015.
Geodrill Ltda. performed pull out and driving piles services.

img

Carrera Pinto, 2015

Solar Pak with a total capacity of 135MW instaled, includes the construction of a substation which connects and injects the power generated to Carrera Pinto substation, lends production to Central Interconnected System (S.I.C.). Located 17.5 kms northeast of Copiapo.
Geodrill Ltda. performed pull out and driving piles services.

img

Los Andes, 2015

The Photovoltaic Park Los Andes has a rated capacity of 220MW to be injected into the Northern Interconnected System (SING) by Los Andes Sub Station. This project was developed in phases, the first 20MW were completed in 2014. It is located 260kms southeast of Antofagasta. Geodrill Ltda. realized the driving piles service.

San Pedro de Atacama III, 2014

The photovoltaic plant San Pedro de Atacama III, with a nominal power of 30MW, covers an area of 200ha., Located in Antofagasta, at south east of the city of Calama. Electric power generating through a link to Norte Grande Interconnected System. Both the process of pull out and driving piles services were did by Geodrill Ltda.

Javiera, 2014

The photovoltaic plant of 69.5 MW DC located in district of Diego de Almagro, city of Copiapo, Atacama, supply energy through the Central Interconnected System (S.I.C. for acronym in Spanish) for working in Los Pelambres Mining in city of Coquimbo.